Runway

フレーズと例文

runway designated   (滑走路指定)

The new runway designated 5R-23L opened July 7, 2011.

It has one paved runway designated 09/27 which measures .

It has one runway designated 18/36 with a asphalt surface.

main runway   (メイン滑走路)

Part of the old main runway is now used as a private airstrip.

The main runway, 10/28, offers of asphalt with a long overshoot.

In an effort to improve the station the main runway was extended in 1955.

paved runway   (舗装された滑走路)

It has one paved runway designated 09/27 which measures .

It got a paved runway in 1963 and a terminal building in 1969.

Near Kumanovo is Adzi Tepe Airport which is without a paved runway.

runway show   (滑走路ショー)

Singer Luke Black made an appearance during the runway show.

In 2008, she chastised Marc Jacobs for having delayed his runway show by two hours.

In 2016, he had a runway show which was inspired by the paintings of Georgia O'Keeffe.

asphalt runway   (アスファルト滑走路)

The airport has an 11,531 ft (3,515 m) asphalt runway.

The airport has one asphalt runway 07/25 which is long.

It has one asphalt runway which is in length.

new runway

The new runway designated 5R-23L opened July 7, 2011.

In 1955, a branch was engaged to build a new runway at Kai Tak Airport in Hong Kong.

Construction of a new runway and facilities for flights to Central Asia began in 2006.

single runway

The airport has a single runway of .

Both the grass runways are wide and at night serve as a single runway.

The airfield consisted of a single runway, running parallel to Wirui Beach.

concrete runway

The airport will have concrete runway and jet bridges.

In 1984, the second concrete runway was put into operation.

In 1960, construction of the first concrete runway was completed.

grass runway

It also has a parallel grass runway which measures .

Approximately 800 m long compacted grass runway with day markers.

There is also a parallel grass runway measuring and paved strip measuring .

second runway

The second runway is .

Following the airport's master plan, Infraero built a second runway, which was finished in 2006.